Supply, install, test and put into operation the following panel boards and final panel boards complete with all necessary accessories as specified and as shown on the drawings.The price should include the study of discrimination and selectivity (full selective) to apply this

study on all panel boards.

Supply, install, test and put into operation 0.6/1 (1.2)KV multicore copper cables PVC insulated and PVC sheathed , laid in UPVC conduits,cable trays…etc which should be included in the price beside connection , terminations and all other accessories to complete the work according to drawings and specification.the price should include also all civil work. and with the following cross sections.

Supply, install, test and put into operation lighting outlets ceiling or wall and / or under ground whatever self controlled or with other outlets with single or double pole,

switch, by using 3×3 mm2, copper wires and using PVC conduits. The price should be for one outlet, and should include conduits, wires, junction boxes, pull boxes, and all other fittings and accessories required to complete the work as per specifications and as shown on the drawings.

Supply, install, test and put into operation lighting outlets for outdoor landscape lighting whatever self controlled or with other outlets with single or double pole, switch, by using 3×6 mm2, copper wires and using PVC flixable conduits. The price should be for one outlet, and should include conduits, wires, junction boxes, pull boxes, and all other fittings and accessories required to complete the work as per specifications (optional).

Supply, install, test and put into operation the lighting fixture listed herein after complete with all accessories and as specified and shown on the drawings.

Supply, install, test and put into operation single phase outlets from the final panel boards to the socket outlet by using 3×3 mm2 copper wires and PVC conduits. The price

should be for one outlet, and should include pipes, wires,

junction boxes, pull boxes and all other accessories, fittings as specified and shown on the drawings.

Supply, install, test and put into operation single phase outlets from the final panel boards to the socket outlet by

using 3×4 mm2 copper wires and PVC conduits. The price should be for one outlet, and should include pipes, wires, junction boxes, pull boxes and all other accessories, fittings as specified and shown on the drawings.

Supply, install, test and put into operation single phase outlets from the final panel boards to the load break switch outlet by using 3×6 mm2 copper wires and PVC conduits.

The price should be for one outlet, and should include

pipes, wires, junction boxes, pull boxes and all other accessories, fittings as specified and shown on the drawings.

Supply, install, test and put into operation single phase outlets from the final panel boards to the load break switch outlet by using 3×10 mm2 copper wires and PVC conduits.

The price should be for one outlet, and should include

pipes, wires, junction boxes, pull boxes and all other accessories, fittings as specified and shown on the drawings.

Supply, install, test and put into operation single phase outlets from the final panel boards to the load break switch outlet by using 3×10 mm2 copper wires and PVC conduits.

The price should be for one outlet, and should include

pipes, wires, junction boxes, pull boxes and all other accessories, fittings as specified and shown on the drawings.

Supply, install, test and put into operation three phase outlets from the final panel boards to the load break switch outlet by using 5×4 mm2 copper wires and PVC conduits.

The price should be for one outlet, and should include

pipes, wires, junction boxes, pull boxes and all other accessories, fittings as specified and shown on the drawings.

Supply, install, test and put into operation three phase outlets from the final panel boards to the load break switch

outlet by using 5×6 mm2 copper wires and PVC conduits. The price should be for one outlet, and should include pipes, wires, junction boxes, pull boxes and all other accessories, fittings as specified and shown on the drawings.

Supply, install, test and put into operation three phase outlets from the final panel boards to the load break switch outlet by using 5×10 mm2 copper wires and PVC conduits.

The price should be for one outlet, and should include

pipes, wires, junction boxes, pull boxes and all other accessories, fittings as specified and shown on the drawings.

Supply, install, test and put into operation the following materials complete with all accessories and as specified

and shown on the drawings.

Single pole one-way one-gange lighting switch 10 Amp.

220V.

Single pole one-way two-gange lighting switch 10 Amp.

220V.

Single pole one-way one-gange lighting switch 10 Amp

220V weather proof.

Single pole one-way two-gange lighting switch 10 Amp

220V weather proof.

Deviator switch one-gange lighting switch 10 Amp. 220V.

Deviator switch two-gange lighting switch 10 Amp. 220V.

Push Button 10A

Single-phase normal socket 220V, 16A .

Single-phase normal socket 220V, 16A weather proof.

Single-phase dublix socket 220V, 16A feed from ups.

Single-phase dublix socket 220V, 16A for genral use.

Single-phase power socket for hand dryer or genral use

220V, 20A (3 pins) .

Floor box not less than IP 67 -4 medules contain one duplex UPS socket 16 A. 220 volt , one normal single

socket 16 A. 220 , one data outlet & one telephone outlet

industrial socket 40Amp- three phase for car charing IP 54

industrial socket 32Amp- single phase for carcharing IP 54

Supply, install, test and put into operation single phase load break switch 16 Amp, 220 Volt including all accessories and materials to complete the work according

to drawing and specifications.

Ditto as above, but weather proof .

Ditto as above, but weather proof & 32 Amp .

Ditto as above, but weather proof & 40 Amp .

Supply, install, test and put into operation three phase load break switch 16 Amp, 380 Volt weather proof including all accessories and materials to complete the work according to drawing and specifications.

Ditto as above but 25 Amp .

Ditto as above but 32 Amp .

Ditto as above but 50 Amp .

Ditto as above but 63 Amp .

Ditto as above but 150 Amp .

Ditto as above but 200 Amp .

Ditto as above but 250 Amp .

Ditto as above but 320 Amp .

Ditto as above but 1250 Amp .

Ditto as above but 2500 Amp .

Supply, install, test and put into operation the earthing system, includes but not be limited (the earthing pits, underground earthing connection cables, the potential equalizer bar and the connection to all metallic parts,…etc) as specified. The earthing resistance should be not more than 3 ohm at each end. The price should include all accessories required and all electrical soil resistivity tests to complete the work as specified and the guided drawings

with good workmanship.

Supply, install, test and put into operation the foundation earthing system The price should include all accessories required to complete the work as specified and with good

workmanship.

Dismantle RE-Installation & powering UPS Units

Dismantle, re-Installation, connect, test and put into operation the following items including all necessary accessories, connections & necessary works required to

complete the operation of the following :

Supplying, Furnishing, installing, connecting and testing of low voltage busway system (3P+N+E) Feeder Bus Bar Trunking type complete with all special fittings, fire barriers, wall flanges, seismic supports, hanging expansion fittings, mounting components, elbows, all necessary accessories and ancillary works and materials required for complete installation as specified and as indicated on the drawings for the following ratings:

Supplying, laying, hooking up and testing 22KV cables (3×240) mm2, aluminium, XLPE, STA,pvc between the Ring Main Units and 22KV Switchgear including excavation, back filling, break

protective

cores, warning tape, UPVC Conduits when crossing streets or when passing under floor tiles, terminations, all necessary accessories and ancillary works and materials required for complete installation as specified and as indicated on the drawings.

Furnishing, Supplying, installing, connecting and testing of the dry type transformer 50 Hz, [22 ±2×2.5% ]/0.4 KV including enclosure and all necessary accessories and ancillary works and materials required for complete installation as specified and as indicated on the drawings for the following ratings:

Supplying, installing, connecting and testing of a 600 KVA (at 50°C ambient) 0.8 p.f., 380V diesel Generator set including all necessary accessories and ancillary works and materials required for complete installation as specified and as indicated on the drawings such as, but not limited to

the following :

Control panel, residential silencer, flexible joints, exhaust pipes, acoustic treatment, fuel tanks lines, foundation, accessories, canvas ducts, air inlet/outlet sound attenuators louvers, monitoring and protection, battery and battery charger. Also including a set of complete erection material

and special tools.

IONIZATION LIGHTNING PROTECTION SYSTEM

Furnishing, Supplying, installing, connecting and testing lightning protection system including all necessary accessories and ancillary works and materials required for complete installation as specified and as indicated on the

drawings.

AUTOMATIC TRANSFER SWITCH ( ATS )

Supplying, installing, connecting and testing automatic transfer switch including control cables, all necessary accessories and ancillary works and materials required for complete installation as specified and as indicated on the

drawings for the following items:

PRIMARY MEDIUM VOLTAGE SWITCHGEAR

AND RING MAIN UNITS

Supplying, installing, connecting and testing ring main units including load break switches, earthing switches, earth fault indicators all necessary accessories and ancillary works and materials required for complete installation as

specified and as indicated on the drawings.

SOLAR PANEL

Supply, install, testing, commissioning, and guarantee of the following turn key PV project, all in accordance with the tender specifications including any civil works required (Builder work…etc) or electrical works. Requirements is determined but not limited to the following:

320W, PV solar panels complete with its terminals, inverters, flat roof mounting system, DC string cables including its hot deep galvanized conduits and cable tray, DC array box, AC cables including stainless steel conduit LV grid connection, AC array box & AC cables.

All materials needed to connect from modules to inverter and have complete job ready for installing high quality PV modules connected, to achieve minimum 30 KWp. (contractor must comply with tender documents ( specifications, Vendor..etc).